N.H. Admin. Code § We 302.02

Current through Register No. 50, December 12, 2024
Section We 302.02 - Exemptions

Notwithstanding We 302.01, above, a water well contractor license or a pump installer license shall not be required for the following activities:

(a) Construction of wells less than or equal to 20 feet in depth for the temporary de-watering of construction sites;
(b) Exploratory excavations analyzing foundation conditions related to the construction of a structure;
(c) Pump installations used for the temporary de-watering of construction sites;
(d) Maintenance and repair of existing pump systems as specified in RSA 482-B:15, when performed by:
(1) A licensed plumber when engaged in the practice of plumbing as defined in RSA 153:27, XIV; or
(2) A licensed electrician when performing electrical installations as defined in RSA 319-C:2, III; and
(e) Temporary pump installations for the purpose of conducting pumping tests on new wells, when performed by the following individuals, provided that after such testing is completed, the final pump installation shall only be performed by a licensed pump installer in accordance with We 302.01(b):
(1) A water distribution system operator licensed in New Hampshire pursuant to RSA 332-E;
(2) A professional engineer licensed in New Hampshire pursuant to RSA 310-A; or
(3) A professional geologist licensed in New Hampshire pursuant to RSA 310-A.

N.H. Admin. Code § We 302.02

#2557, eff 12-27-83; ss by #4730, eff 1-15-90; ss by #4898, eff 8-13-90; EXPIRED: 8-13-96

New. #6327, INTERIM, eff 8-24-96, EXPIRED: 12-22-96

New. #6449, eff 1-29-97; ss by #7307, eff 6-13-00; ss by #9179, eff 6-13-08

Amended by Volume XXXVII Number 2, Filed January 12, 2017, Proposed by #12083, Effective 3/1/2017, Expires 3/1/2027.