N.H. Admin. Code § Saf-C 3312.01

Current through Register No. 36, September 5, 2024
Section Saf-C 3312.01 - Non-compliance of Manufacturer's Building System
(a) The department or an agency shall notify a manufacturer with an approved building system of area(s) of non-compliance which, if not corrected, shall result in a denial of the approval of the building system.
(b) The notification pursuant to (a) above shall be in writing and shall set forth the areas of non-compliance to be corrected.
(c) Upon receipt of the notification, the manufacturer shall have no more than 30 days, or a mutually agreed upon time frame, to correct the area(s) of non-compliance. Upon verification by the department or the agency that the area(s) of non-compliance are corrected, the manufacturer shall receive a written statement from the department or an agency indicating acceptance of the corrective action.
(d) If a manufacturer has not corrected the area(s) of non-compliance described in the notification pursuant to (b) above after 30 days, or the mutually agreed upon time frame, the department shall schedule a hearing to determine whether the manufacturer's certification shall be revoked or suspended pursuant to the requirements of Saf-C 3312.03.

N.H. Admin. Code § Saf-C 3312.01

#5439, eff 7-24-92; ss by #6810, INTERIM, eff 7-25-98, EXPIRES: 11-22-98; ss by #6885, eff 11-18-98;ss by #8741, INTERIM, eff 11-18-06, EXPIRED: 5-17-07

New. #9752, eff 7-9-10

Amended by Volume XXXIX Number 16, Filed April 18, 2019, Proposed by #12737, Effective 3/8/2019, Expires 3/8/2029.