Section Puc 905.05 - Periodic Testing
(a) With respect to a net-metered facility which interfaces with the electric distribution system by an inverter, the customer-generator shall, if requested to do so by the distribution utility, conduct a load-break test, as described in Puc 905.04(b), once per year after installation.
(b) With respect to a net-metered facility that does not interface with the electric distribution system by an inverter, the customer-generator shall:
(1) Conduct a load-break test, as described in Puc 905.04, once per year after installation; and
(2) Verify the proper calibration and protective function of the components and systems of the facility, which shall include the testing prescribed by each facility component manufacturer:
a. Once every 4 years or according to the schedule recommended by the manufacturer, whichever is more frequent, for facilities rated greater than 25 kilowatts; or
b. Once every 4 years for facilities rated 25 kilowatts or less.
(c) The testing of the calibration and protective function of the components and systems of a non-inverter interfaced system shall be conducted by an individual qualified as provided in Puc 905.04(e) and (f).
(d) The customer-generator shall:
(1) Create a written record of the dates and procedures for tests conducted pursuant to this section; and
(2) Maintain the written record of verification testing for inspection by the distribution utility for a period of 4 years from the date of each respective test.

N.H. Admin. Code § Puc 905.05

#7424, eff 1-12-01; ss by #9353, INTERIM, eff 1-12-09, EXPIRED: 7-11-09

New. #9515, eff 7-18-09; ss by #9998, eff 9-20-11

Amended by Volume XL Number 33, Filed August 13, 2020, Proposed by #13080, Effective 9/14/2020, Expires 9/14/2030