Section Puc 409.05 - Form T-5 Facility Disruption Report The "Facility Disruption Report" required by Puc 406.03(d), shall include:
(a) Utility filing information;(b) The date of the report;(c) The date and time of the outage;(d) The location of the outage;(e) Whether an entire exchange was affected, to the best knowledge of the ELEC or ILEC;(f) The number of affected access lines;(g) The cause of the outage;(h) The date and time service was restored;(i) The name of the person contacted at the commission; and(j) The date and time the commission was contacted.N.H. Admin. Code § Puc 409.05
#10542, eff 3-12-14 (See Revision Note #2 at chapter heading for Puc 400)
Ss by #10542, eff 3/12/2014 (See Revision Note #2 at chapter heading for Puc 400).