At least 6 months prior to network changes which might affect existing or pending interconnections, ELECs and ILECs shall make available necessary information relating to network design and technical standards, and information concerning changes to the network that affect interconnection.
N.H. Admin. Code § Puc 407.03
#8348, eff 5-10-05 (See Revision Note #1 at chapter heading for Puc 400); ss by #10542, eff 3-12-14 (See Revision Note #2 at chapter heading for Puc 400)