N.H. Admin. Code § Puc 308.18

Current through Register No. 50, December 12, 2024
Section Puc 308.18 - Quarterly Reporting of Electric Utility Reliability Measures

Each utility shall on a quarterly basis complete a report of electric utility reliability measures on Form E-38 dated 12/2013 and available at the commission website at www.puc.nh.gov/forms, and file one signed original and one electronic copy with the commission.

N.H. Admin. Code § Puc 308.18

Amended byVolume XXXIV Number 24, Filed June 12, 2014, Proposed by #10603, Effective 5/21/2014, Expires5/21/2024 .