Each utility shall on an annual basis complete a report of total electric meter tests on Form E-3 dated 10/2013 and available at the commission website at www.puc.nh.gov/forms, and file one signed original and one electronic copy with the commission.
N.H. Admin. Code § Puc 308.03
#2011, eff 5-4-82; ss by #2912, eff 11-26-84; ss by #4999, eff 11-26-90; ss by #6381, INTERIM, eff 11-27-97, EXPIRED: 3-27-97
New. #6605, eff 10-21-97; ss by #8448, eff 10-18-05