N.H. Admin. Code § Puc 302.10

Current through Register No. 45, November 7, 2024
Section Puc 302.10 - Full load

"Full load" means the meter accuracy test point at rated test voltage, rated test current and 1.0 power factor.

N.H. Admin. Code § Puc 302.10

#8448, eff 10-18-05

Amended by byVolume XXXIV Number 24, Filed June 12, 2014, Proposed by #10603, Effective 5/21/2014, Expires5/21/2024 .