N.H. Admin. Code § Puc 1402.01

Current through Register No. 45, November 7, 2024
Section Puc 1402.01 - Reports to Commission
(a) If deemed necessary by the commission to evaluate the safe operation of gas pipelines and to fulfill its authority under RSA 374:3, each utility and any owner or operator of a pipeline facility regulated by the Federal Energy Regulatory Commission shall provide the commission, upon its request, the results of any tests and summaries of any records required under state or federal law. Such tests and summaries may include but not be limited to operating pressures, welding procedures, construction procedures, incident reporting, and accident reporting, and other practices that relate to the safe operation of pipelines.
(b) Each utility and any owner or operator of a pipeline facility regulated by the Federal Energy Regulatory Commission shall file reports with the commission on such forms as the commission shall specify as provided in Puc 1403.
(c) Copies of forms shall be furnished by the commission upon request.

N.H. Admin. Code § Puc 1402.01

#6445, eff 1-28-97; ss by #8245, eff 12-31-04; ss by #10343, eff 5-22-13