N.H. Admin. Code § Pas 305.04

Current through Register No. 50, December 12, 2024
Section Pas 305.04 - Notice and Sample Required
(a) Before any concrete is poured for either terminal or tower foundations, the tramway inspector shall be notified at least 48 hours prior to the expected date and time of pouring.
(b) If the required notice has been given pursuant to (a) above, the pouring may be carried out in the absence of a tramway inspector or another representative of the board.
(c) Two sample cylinders of concrete from each truckload, or from each batch if on site mixing is done, shall be tested to ascertain that the compression strength of the concrete meets the minimum requirements of the designer. The area operator shall be responsible for having the test done and shall submit a record of such test to the board.

N.H. Admin. Code § Pas 305.04

#2297, eff 2-7-83; ss by #2704, eff 5-9-84, EXPIRED 5-9-90 (formerly Saf-S 1005.04)

New. #4862, eff 7-10-90; amd by #5434, eff 7-8-92; amd by #6020, eff 4-14-95; ss by #6284, eff 7-10-96; ss by #7800, eff 12-11-02, EXPIRED: 12-11-10

New. #10072, eff 1-11-12