N.H. Admin. Code § Env-Wt 808.11

Current through Register No. 50, December 12, 2024
Section Env-Wt 808.11 - Survey Requirements
(a) If an accurate survey does not already exist for property that is the subject of a request for funding from the ARM Fund, the applicant shall obtain a property survey after the applicant receives notification from the department that the applicant's application for funding has been selected and prior to the funding being provided.
(b) The applicant shall provide the department with 2 paper copies, a copy on Mylar or equivalent substrate suitable for recording at the registry of deeds, and a digitized polygon file of the standard property survey for the property that is the subject of the proposed project.
(c) A New Hampshire licensed surveyor shall perform a standard property survey in accordance with the standards specified in Lan 503.03 - Lan 503.10 or successor rules.
(d) The turning points of the boundaries shall be marked with permanent monuments and the boundary lines shall be blazed or painted so that they can be located in the field.
(e) The survey plan shall include:
(1) The property boundaries and acreage; and
(2) The method and accuracy of the survey.

N.H. Admin. Code § Env-Wt 808.11

Derived From Volume XXXVI Number 01, Filed January 7, 2016, Proposed by #11000, Effective 2/1/2016, Expires 2/1/2026.
Amended by Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12808, Effective 12/15/2019, Expires 12/15/2029.