N.H. Code Admin. R. Env-Wt 803.06

Current through Register No. 25, June 20, 2024
Section Env-Wt 803.06 - Compensatory Mitigation Site Location
(a) For a project for which permittee-responsible mitigation is proposed, the applicant shall give preference to any mitigation site that:
(1) Is located in the same HUC 12-digit watershed as the impacted jurisdictional area(s); and
(2) Abuts land that already is subject to a conservation interest.
(b) If a stream crossing project is not a replacement for an existing tier 3 stream crossing, the applicant may propose, as mitigation, upgrading a similar tier 2 or tier 3 stream crossing within the same watercourse or in the same town as the project.

N.H. Code Admin. R. Env-Wt 803.06

#8062, eff 3-13-04; ss by #8341, eff 4-25-05 (See Revision Note at chapter heading of Env-Wt 800); ss by #8911, eff 6-20-07

Amended by Volume XXXVI Number 01, Filed January 7, 2016, Proposed by #11000, Effective 2/1/2016, Expires 2/1/2026.
Amended by Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12808, Effective 12/15/2019, Expires 12/15/2029.