N.H. Code Admin. R. Env-Wt 609.08

Current through Register No. 25, June 20, 2024
Section Env-Wt 609.08 - Repair of Existing Rip-Rap
(a) Existing rip-rap may be maintained in-kind, repaired in-kind, or replaced in-kind as a minimum impact tidal shoreline stabilization project only if the work meets the requirements of Env-Wt 609.10.
(b) The applicant shall provide the following with or as part of an application for any work that does not qualify under Env-Wt 609.10:
(1) A signed certification that the rip-rap that is the subject of the work is an existing legal structure; and
(2) The design information specified in Env-Wt 609.07(b)(2)-(6).

N.H. Code Admin. R. Env-Wt 609.08

Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12806, Effective 12/15/2019, Expires 12/15/2029.