N.H. Admin. Code § Env-Wt 527.03

Current through Register No. 50, December 12, 2024
Section Env-Wt 527.03 - Application Requirements for Public Highway Projects

The project-specific information required by Env-Wt 310.01(c)(1) or Env-Wt 311.03(b)(11), as applicable, for a C/M project shall be as follows:

(a) A description of the scope of the project, the size of the impacts to aquatic resources, and the purpose of the project;
(b) An accurate drawing with existing and proposed structure dimensions clearly annotated to:
(1) Document existing site conditions;
(2) Detail the precise location of the project and show the impact of the proposed activity on jurisdictional areas;
(3) Show existing and proposed contours at 2-foot intervals;
(4) Show existing and proposed structure invert elevations on the plans; and
(5) Use a scale based on standard measures of whole units, such as an engineering rule of one to 10, provided that if plans are not printed at full scale, a secondary scale shall be noted on the plans that identifies the half scale unit of measurement;
(c) All easements and right-of-way acquisition area outlines in relation to the project;
(d) The name of the professional engineer who developed the plans, whether an employee of the applicant or at a consulting firm; and
(e) An erosion control plan that shows:
(1) Existing and proposed contours at 2-foot intervals, with existing contours shown with a lighter line weight and proposed contours shown with a heavier line weight such as a bold font; and
(2) The outermost limit of all work areas, including temporary phasing work, with perimeter controls.

N.H. Admin. Code § Env-Wt 527.03

Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.