N.H. Code Admin. R. Env-Wt 519.07

Current through Register No. 25, June 20, 2024
Section Env-Wt 519.07 - Construction Requirements for Ponds

In addition to all applicable construction requirements in Env-Wt 307, the following shall apply to pond construction projects:

(a) All construction activities shall be conducted in compliance with applicable requirements of RSA 483-B and Env-Wq 1400;
(b) The applicant shall notify NHF & G, in accordance with RSA 211:11, prior to performing a drawdown or dewatering a resource; and
(c) Discharges from dewatering shall be to sediment basins that are:
(1) Located in upland areas at least 20 feet from any waterbody; and
(2) Lined with hay bales or other sediment-trapping liners.

N.H. Code Admin. R. Env-Wt 519.07

Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.