N.H. Admin. Code § Env-Wt 517.09

Current through Register No. 50, December 12, 2024
Section Env-Wt 517.09 - Removal of Boardwalks

A project to remove a boardwalk shall be classified as a minimum impact project if the work is done to minimize impacts to wetlands and surface waters.

N.H. Admin. Code § Env-Wt 517.09

Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.