A project to remove a boardwalk shall be classified as a minimum impact project if the work is done to minimize impacts to wetlands and surface waters.
N.H. Code Admin. R. Env-Wt 517.09
A project to remove a boardwalk shall be classified as a minimum impact project if the work is done to minimize impacts to wetlands and surface waters.
N.H. Code Admin. R. Env-Wt 517.09