Current through Register No. 45, November 7, 2024
Section Env-Wt 514.06 - On-Going Requirements for All Bank/Shoreline Stabilization Projects The owner shall monitor the project and take corrective measures if the area is inadequately stabilized or restored by:
(a) Replacing fallen or displaced materials without a permit, where no machinery in the channel is required;(b) Identifying corrective actions and follow-up plans in accordance with Env-Wt 307; and(c) Filing appropriate application and plans where work exceeds (a), above.N.H. Admin. Code § Env-Wt 514.06
Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.