N.H. Code Admin. R. Env-Wt 514.06

Current through Register No. 25, June 20, 2024
Section Env-Wt 514.06 - On-Going Requirements for All Bank/Shoreline Stabilization Projects

The owner shall monitor the project and take corrective measures if the area is inadequately stabilized or restored by:

(a) Replacing fallen or displaced materials without a permit, where no machinery in the channel is required;
(b) Identifying corrective actions and follow-up plans in accordance with Env-Wt 307; and
(c) Filing appropriate application and plans where work exceeds (a), above.

N.H. Code Admin. R. Env-Wt 514.06

Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.