N.H. Code Admin. R. Env-Wt 510.03

Current through Register No. 25, June 20, 2024
Section Env-Wt 510.03 - Hand Removal of EAW Without a Permit

No permit shall be required for hand removal of EAW or the installation and maintenance of benthic barriers on the bottom of a surface water to control the growth of EAW, as authorized by RSA 487:17, provided:

(a) The work is conducted by divers who have received training in EAW control diving from a diving instructor that is registered and confirmed with the department's invasive species coordinator;
(b) The project is conducted in accordance with a long-term management plan designed pursuant to Env-Wq 1305.03;
(c) The project is not located in a PRA;
(d) In flowing waters, harvesting will be initiated only at the most upstream location of the infestation, where practicable; and
(e) The project does not qualify as a major project under Env-Wt 400.

N.H. Code Admin. R. Env-Wt 510.03

Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.