N.H. Admin. Code § Env-Wt 310.03

Current through Register No. 50, December 12, 2024
Section Env-Wt 310.03 - Conditions for EXPs

The following conditions shall apply to all work done pursuant to an EXP:

(a) No other work shall be done on the subject property pursuant to another EXP, PBN, or an SPN for a period of 12 months from the date the EXP was issued unless the property owner submits information, including a plan, to demonstrate that:
(1) The proposed work is wholly unrelated to and separate from the work already done under the EXP, PBN, or SPN; and
(2) The proposed work and the work already done under the EXP, PBN, or SPN do not, when combined, constitute a project for which a standard permit is required;
(b) The work shall comply with all applicable conditions specified in Env-Wt 307; and
(c) Any work shall be timed and carried out to protect documented occurrences of cold water or threatened or endangered fisheries.

N.H. Admin. Code § Env-Wt 310.03

Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12803, Effective 12/15/2019, Expires 12/15/2029 (See Revision Notes #1, #2, and #3 at chapter heading for Env-Wt 300).
Amended by Volume XL Number 46, Filed November 12, 2020, Proposed by #13124, Effective 10/23/2020, Expires 10/23/2030.
Amended by Number 45, Filed November 9, 2023, Proposed by #13777, Effective 10/13/2023, Expires 10/13/2033.