Section Env-Wr 405.08 - Final Inspection Report
(a) The construction engineer shall submit an inspection report to the department within 30 days of the completion of the project.
(b) The report shall include:
(1) A copy of all test results;
(2) The construction engineer's observations of the work items specified in Env-Wr 405.05;
(3) Representative construction progress photographs;
(4) Documentation of department-approved changes in design;
(5) Documentation and results of all construction inspections, including photographs;
(6) Foundation conditions observed during excavation; and
(7) Any other data pertinent to determining the integrity of the structure.