Rule (Env-Wq) | Reference | Obtain From (Cost) |
806.01(c)(9) | Site-Specific Soil Mapping Standards for New Hampshire and Vermont, Special Publication No. 3, February 2011 | Society of Soil Scientists of Northern New England No cost to download from: |
806.07(h)(3) | Best Management Practices: Biosolids, July 2014 | UNH Cooperative Extension No cost to download from: https://extension.unh.edu/resources/files/Resource005011_Rep7148.pdf |
New England Interstate Water Pollution Control Commission (NEIWPCC) Wannalancit Mills 650 Suffolk Street, Suite 410 Lowell, MA 01854 (978) 323-7929 mail@neiwpcc.org | ||
809 .05(d) | "The Wastewater Treatment Plant Operators Guide to Biosolids Sampling Plans", September 2006 | No cost to download from: http://click.neiwpcc.org/neiwpcc_docs/biosampleguide/biosampleguide_web.pdf |
807 .08(a) | TR-16, "Guides for the Design of Wastewater Treatment Works", 2011 | $95.00 (hardcopy) $25 (CD) |
N.H. Admin. Code Env, Env-Wq, ch. Env-Wq 800, pt. Env-Wq 811, app B