Current through Register No. 44, October 31, 2024
Section Env-Wq 708.15 - Instrumentation and Control Requirements Any supervisory control and data acquisition (SCADA) system included in the design shall have the following minimum capabilities:
(a) Air flow rate and flow pacing of blowers;(b) Alarm generation and history;(c) Influent flow history and trending;(d) Dissolved oxygen history and trending;(e) Power monitoring for main process pumps and motors and blowers and motors, including at a minimum the ability to monitor: (1) Power factor data at equipment startup;(2) Total harmonic distortion; and(f) Return activated sludge pump flow rate and pacing;(g) Real time monitoring and recording of energy use; and(h) Automated equipment system monitoring and control for the following, as applicable: (2) Chemical feed systems;N.H. Admin. Code § Env-Wq 708.15
Adopted byVolume XXXIV Number 46, Filed November 13, 2014, Proposed by #10693, Effective 10/15/2014, Expires10/15/2024.