N.H. Admin. Code § Env-Wq 708.08

Current through Register No. 44, October 31, 2024
Section Env-Wq 708.08 - Operation and Maintenance Manuals
(a) Operation and maintenance manuals providing information and guidance for day-to-day operation of the WWTP shall be submitted to the department within 60 days following substantial completion of construction of the WWTP.
(b) The operation and maintenance manuals required by (a), above, shall include all information that is necessary to operate and maintain the specific equipment at the WWTP, including but not limited to the following:
(1) Information on process design assumptions;
(2) Unit process information that includes detailed process descriptions and accepted parameters, control measures and monitoring procedures for the various processes;
(3) Start-up procedures for each unit operation and piece of equipment;
(4) Maintenance management systems;
(5) Laboratory test procedures;
(6) Safety procedures;
(7) Organizational structure and administrative procedures;
(8) Troubleshooting procedures;
(9) Emergency operation plan;
(10) Staffing requirements;
(11) Process and instrumentation diagrams;
(12) Checklists for systems and components for the operator's use in developing a maintenance program for WWTPs;
(13) Utility emergency contact information;
(14) Staff training and licenses necessary for chief operator and assistant operator;
(15) A list of each chemical used in process and what the chemical is used for, together with the applicable MSDS ; and
(16) Equipment supplier manuals.

N.H. Admin. Code § Env-Wq 708.08

(See Revision Note at chapter heading for Env-Wq 700) #8590, eff 3-25-06

Amended byVolume XXXIV Number 46, Filed November 13, 2014, Proposed by #10693, Effective 10/15/2014, Expires10/15/2024.