Current through Register No. 50, December 12, 2024
Section Env-Wq 705.10 - Sewage Pumping Station Operation and Maintenance Manual(a) The owner shall submit an operation and maintenance manual that provides information and guidance for day-to-day operation of each sewage pumping station to the department within 60 days following substantial completion of construction of the pump station.(b) The operation and maintenance manual required by (a), above, shall include all information that is necessary to operate and maintain the specific equipment at the pumping station, including but not limited to the following: (1) Information on process design assumptions;(2) Unit process information that includes detailed process descriptions, control measures and monitoring procedures for processes, if applicable;(3) Start-up procedures for each unit operation as applicable and each piece of equipment;(4) Maintenance management systems;(5) Laboratory test procedures;(7) Organizational structure and administrative procedures;(8) Troubleshooting procedures;(9) Emergency operation plan;(10) Staffing requirements;(11) Process and instrumentation diagrams;(12) Checklists for systems and components for the operator's use in developing a maintenance program for pump stations;(13) Utility emergency contact information;(14) Staff training and licenses necessary for the chief operators and assistant operators;(15) A list of each chemical used at the pump station and what the chemical is used for, together with the applicable material safety data sheet (MSDS); and(16) Equipment supplier manuals.N.H. Admin. Code § Env-Wq 705.10
Adopted byVolume XXXIV Number 46, Filed November 13, 2014, Proposed by #10693, Effective 10/15/2014, Expires10/15/2024.