N.H. Admin. Code § Env-Wq 703.05

Current through Register No. 50, December 12, 2024
Section Env-Wq 703.05 - Design Drawings for Sewage Pumping Stations

Design drawings for proposed sewage pumping stations shall, in addition to meeting the applicable requirements of Env-Wq 703.01 through Env-Wq 703.04, include the following:

(a) Existing sewage pumping station locations and elevations;
(b) The location(s) and elevation(s) of all proposed sewage pumping station(s), including provisions for installation of future pump(s) if required to meet full build-out of the service area.
(c) Test boring logs and groundwater elevations; and
(d) 100-year and 500-year flood elevations, if applicable.

N.H. Admin. Code § Env-Wq 703.05

(See Revision Note at chapter heading for Env-Wq 700) #8590, eff 3-25-06

Amended byVolume XXXIV Number 46, Filed November 13, 2014, Proposed by #10693, Effective 10/15/2014, Expires10/15/2024.