Current through Register No. 50, December 12, 2024
Section Env-Wq 403.02 - Applicability(a) These rules shall apply to: (1) The development of a new source of groundwater that constitutes a large groundwater withdrawal;(2) The renewal of an existing large groundwater withdrawal permit;(3) The development of a replacement well for an existing large groundwater withdrawal; and(4) The new extraction or drainage of groundwater from a shaft or hole in the earth that equals or exceeds 57,600 gallons in any 24-hour period.(b) These rules shall not apply to the removal or diversion of water that is not groundwater from an excavation.N.H. Admin. Code § Env-Wq 403.02
(See Revision Note at part heading for Env-Wq 403) #9569, eff 10-17-09
Amended by Volume XXXVIII Number 15, Filed April 12, 2018, Proposed by #12493, Effective 3/21/2018, Expires 3/21/2028.