Current through Register No. 49, December 5, 2024
Section Env-Wq 2101.26 - Approval(a) The department shall issue a written decision on the water conservation plan within 45 days of receipt of the plan.(b) The department shall approve the water conservation plan if the department determines that: (1) The water conservation plan is complete and correct;(2) The water conservation plan demonstrates that the applicable water conservation measures required by Env-Wq 2101.05 through Env-Wq 2101.22 are being or will be implemented in accordance with the specified timeframes; and(3) The applicant has sent the notice as required by Env-Wq 2101.25.(c) The department shall include in its approval such conditions as are required to ensure the water conservation plan is implemented as required.(d) As a condition of obtaining approving of the water conservation plan, the owner of a conservation system shall use one of the following pipe identification and location methods for any non-metallic pipe installed in the water system's distribution system on or after May 15, 2013: (1) Detectable tracer tape;(2) Detectable tracer wire; or(3) GPS locations of pipe for which the data is maintained in a geographic information system dataset.(e) The department shall not approve the water conservation plan if the criteria specified in (b), above, are not met.(f) If the department does not approve the water conservation plan, the department shall specify the reason(s) in the notice sent pursuant to (b), above.N.H. Admin. Code § Env-Wq 2101.26