N.H. Code Admin. R. Env-Wq 1609.08

Current through Register No. 25, June 20, 2024
Section Env-Wq 1609.08 - Management Plan

The management plan required under Env-Wq 1609.01(c)(3) shall include the following:

(a) The normal hours of operation of the site;
(b) Stockpiling, transfer/storage or holding tank provisions, if applicable;
(c) The volume of septage, in gallons, expected on a periodic basis, such as daily, weekly or monthly;
(d) The volume of septage, in gallons, expected over the entire life expectancy of the facility, if applicable;
(e) The proposed measures to meet pathogen and vector attraction reduction requirements, if applicable, specified in Env-Wq 1608.09(a)(1);
(f) Additional on-site measures to be taken to control vectors;
(g) A detailed odor control plan explaining:
(1) The procedures that shall be used to address and resolve any odor complaints;
(2) Additional management techniques employed to minimize odors; and
(3) The name, mailing address, and daytime telephone number of the individual(s) who will be responsible for responding to odor complaints;
(h) A copy of the facility contingency plan describing course(s) of action to be followed in case of emergency or other special conditions, such as:
(1) Equipment breakdowns;
(2) Fire;
(3) Vectors;
(4) Explosion;
(5) Spills;
(6) Receipt or release of hazardous or toxic materials or substances;
(7) Groundwater, surface water or air contamination attributable to a facility; and
(8) Other incidents that could threaten public health or safety or the environment; and
(i) A description of how all operators of the facility were or shall be instructed on the applicable requirements prior to working at the facility.

N.H. Code Admin. R. Env-Wq 1609.08

#8458, eff 10-27-05 (see Revision Note at chapter heading); ss by #10466, eff 11-26-13