The water quality volume for the project shall be calculated in accordance with Env-Wq 1504.10 with the exception that the impervious area of the panels may be excluded from the calculation provided runoff from panels will discharge as sheet flow pursuant to Env-Wq 1511.05.
N.H. Admin. Code § Env-Wq 1511.03