N.H. Code Admin. R. Env-Wq 1507.06

Current through Register No. 25, June 20, 2024
Section Env-Wq 1507.06 - Peak Runoff Control Requirements
(a) The purpose of this section is to address increases in the frequency and magnitude of flooding caused by development.
(b) Subject to (d), below, the 10-year, 24-hour post-development peak flow rate shall not exceed the 10-year, 24-hour pre-development peak flow rate for all flows leaving the site.
(c) Subject to (d), below, the 50-year, 24-hour post-development peak flow rate shall not exceed the 50-year, 24-hour pre-development peak flow rate for all flows leaving the site.
(d) A project area that directly discharges to a stream, waterbody, estuary, or tidal water shall be exempt from (b) and (c), above, if the applicant has provided supporting off-site drainage calculations for the 10-year and 50-year, 24-hour storm in accordance with Env-Wq 1504.09, showing that at a point immediately downstream from the project site the post-development peak flow rate from the site and the off-site contributing area does not exceed the pre-development peak flow rate at that point.
(e) The applicant shall provide supporting information in accordance with Env-Wq 1503.09, showing that there is no impact to properties as a result of developing within the 100-year floodplain.

N.H. Code Admin. R. Env-Wq 1507.06

(See Revision Note #1 at chapter heading for Env-Wq 1500) #9343, eff 1-1-09; (See Revision Note #2 at chapter heading for Env-Wq 1500) amd by #9817-A, eff 12-1-10

Amended by Volume XXXVII Number 32, Filed August 10, 2017, Proposed by #12342, Effective 8/15/2017, Expires 8/15/2027.