Section Env-Wq 1506.10 - Sediment Control Methods: Temporary Sediment Trap

Temporary sediment traps shall comply with the following:

(a) The trap shall be installed as close to the disturbed area or source of sediment as possible;
(b) The maximum contributing drainage area to the trap shall be less than 5 acres;
(c) The minimum volume of the trap shall be 3,600 cubic feet of storage for each acre of drainage area;
(d) The side slopes of the trap shall be 3:1 or flatter, and shall be stabilized immediately after their construction;
(e) The outlet of the trap shall be a minimum of one foot below the crest of the trap and shall discharge to a stabilized area;
(f) The trap shall be cleaned when 50 percent of the original volume is filled; and
(g) The materials removed from the trap shall be properly disposed of and stabilized.