N.H. Admin. Code § Env-Wq 1406.20

Current through Register No. 44, October 31, 2024
Section Env-Wq 1406.20 - Conditions Applicable to All Projects in the Protected Shoreland

The following conditions shall apply to all projects in the protected shoreland, in addition to any project-specific conditions included pursuant to Env-Wq 1406.15 and regardless of whether a permit is obtained:

(a) Erosion and siltation control measures shall:
(1) Be installed prior to the start of work;
(2) Be maintained throughout the project; and
(3) Remain in place until all disturbed surfaces are stabilized;
(b) Erosion and siltation controls shall be appropriate to the size and nature of the project and to the physical characteristics of the site, including slope, soil type, vegetative cover, and proximity to wetlands or surface waters;
(c) No person undertaking any activity in the protected shoreland shall cause or contribute to, or allow the activity to cause or contribute to, any violations of the surface water quality standards established in Env-Ws 1700 or successor rules in Env-Wq 1700;
(d) Any fill used shall be clean sand, gravel, rock, or other suitable material; and
(e) For any project where mechanized equipment will be used, orange construction fence shall:
(1) Be installed prior to the start of work at the limits of the temporary impact area as shown on the plans approved as part of a permit or accepted as part of the permit by notification;
(2) Be maintained throughout the project; and
(3) Remain in place until all mechanized equipment has been removed from the site.

N.H. Admin. Code § Env-Wq 1406.20

Derived From Volume XXXVII Number 2, Filed January 12, 2017, Proposed by #12062, Effective 12/17/2016, Expires 12/17/2026.