N.H. Admin. Code § Env-Wq 1403.03

Current through Register No. 44, October 31, 2024
Section Env-Wq 1403.03 - Construction Within the Protected Shoreland
(a) All impacts related to construction shall be completely contained within the area of disturbance allowed by RSA 483-B:9, V(b)(2)(A) as appropriate given the area of the lot within the natural woodland buffer.
(b) Within 3 days of final grading or temporary suspension of work in an area that is in the protected shoreland, all exposed soil areas shall be stabilized by:
(1) Seeding and mulching, if during the growing season;
(2) If not within the growing season, by mulching with tack or netting; or
(3) With an alternative method of temporary stabilization as specified in Env-Wq 1500.
(c) A maximum of 150 square feet of retaining wall may be excluded from the calculation of impervious area, provided the wall has a footprint of 12 inches or less in width.

N.H. Admin. Code § Env-Wq 1403.03

(See Revision Note at chapter heading for Env-Wq 1400) #9188, eff 7-1-08; amd by #9196, INTERIM, eff 7-1-08, EXPIRES: 12-28-08; ss by #9349, eff 12-20-08

Amended by Volume XXXVII Number 2, Filed January 12, 2017, Proposed by #12062, Effective 12/17/2016, Expires 12/17/2026.