N.H. Code Admin. R. Env-Wq 1203.03

Current through Register No. 25, June 20, 2024
Section Env-Wq 1203.03 - Connection to WRBP System
(a) The applicant for a permit to connect to the WRBP system shall provide the following to the WRBP on or with a "Connection Permit Application" form obtained from the WRBP:
(1) The name, mailing address, email address, and daytime telephone number of the applicant;
(2) The location where the connection to the WRBP system is to be made including:
a.Street address;
b. Tax map and lot number ; and
c. A description of the approximate location on the interceptor where the connection will be made;
(3) The name and contact information, including a mailing address and daytime telephone number, of the primary construction site contact person, if other than the applicant;
(4) The estimated date of service connection;
(5) The name, mailing address, email address, and daytime telephone number of:
a.The contractor installing the service connection;
b.If necessary, the contractor coring the interceptor;
(6) The signature of the applicant's authorized representative, as specified in Env-Wq 1205.08;
(7) The title, if applicable, of the applicant's authorized representative;
(8) The certification specified in Env-Wq 1205.09;
(9) The date of the application;
(10) Plans or drawings showing the details of the service connections; and
(11) The approval of an authorized community official, including:
a.The name, title, and signature of the community official approving the application; and
b.The date of approval.
(b) The WRBP shall approve the application and issue a connection permit if it determines that:
(1) The information submitted pursuant to (a), above, is complete and appears to be accurate; and
(2) If constructed and operated as specified in the application, the connection and discharge will comply with all applicable requirements of these rules and Env-Wq 700.
(c) Costs for labor or material incurred by the WRBP or the community during the process of connection to the sewer shall be borne by the property owner, in accordance with RSA 149-:71 and RSA 485-A:48.
(d) Not less than 48 hours in advance of the time any connection is to be made to any public sewer or WRBP interceptor, the person to whom the service connection permit was issued shall notify the community and the WRBP that the service connection is ready for inspection, testing, and connection to the public sewer or WRBP interceptor.
(e) The connection and testing of the service connection to the WRBP system shall be made only under the supervision of, and in the presence of, an inspector from the community who shall complete the permit application section regarding the exact date, location and description of the connection, including GPS coordinates, and return the completed form to the WRBP and provide a copy to the community.

N.H. Code Admin. R. Env-Wq 1203.03

#8235, eff 12-22-04 (See Revision Note at chapter heading for Env-Wq 1200) (formerly Env-Ws 1203.03 ); ss by #9798-A, eff 10-9-10 (from Env-Wq 1203.07)

Amended by Volume XXXIX Number 16, Filed April 18, 2019, Proposed by #12739, Effective 3/19/2019, Expires 3/19/2029.