Where sloping ground is used for construction of the EDA, a small temporary dike or surface water diversion ditch shall be constructed above the EDA to prevent the EDA from being washed out by rain. The dike shall be maintained or the ditch kept free of obstruction until the EDA becomes stabilized with vegetation, at which time the dike or ditch shall be filled in unless the setback distance in Env-Wq 1008.04, table 1008-2 are met.
N.H. Admin. Code § Env-Wq 1016.08
(See Revision Note at chapter heading for Env-Wq 1000) #9086, eff 2-9-08