N.H. Code Admin. R. Env-Wq 1008.03

Current through Register No. 25, June 20, 2024
Section Env-Wq 1008.03 - Daily Flow Volume
(a) In order to determine the appropriate size of the septic system components, such as the septic tank, pipe, and bed, the daily flow volume of sewage in gallons per day shall be determined as specified in this section.
(b) For existing uses, flow shall be based on:
(1) Metered water readings for the use as specified in (d), below, if available; or
(2) The unit design flows listed in Table 1008-1.
(c) For new uses, flow shall be based on:
(1) The unit design flows listed in Table 1008-1; or
(2) Metered water readings for uses that are as similar as possible to the proposed use, taking into consideration factors such as occupancy and frequency of use, determined as specified in (d), below.
(d) Design flows based on metered water readings shall be calculated:
(1) By finding the average of water meter readings over a period of time that is representative of the volume of water used and multiplying the average by a minimum peaking factor of 2 for commercial light flow or a maximum peaking factor of 3 for commercial heavy flow; or
(2) By measuring not less than 6 months of consecutive daily meter readings, including the month(s) of heaviest use for uses that are seasonal in nature, and using the highest daily flow without application of a peaking factor;
(e) The unit design flow figures referenced in (b) and (c), above, shall be as listed in Table 1008-1, below, subject to (f) through (h), below:

Table 1008-1: Unit Design Flow Figures

Use

Unit Design Flow

AIRPORTS

5 GPD/Transient plus 10 GPD/Employee

APARTMENTS

See Dwellings

BARS, LOUNGES

See Food Service

BED & BREAKFAST

60 GPD/Guest, based on the greater of 2 guests per room or the actual number of guests the room is designed to accommodate, plus 10 GPD/Employee

BUNKHOUSE

60 GPD/Person

CAMPS:

Campground with Central Comfort Station

45 GPD/site, plus 20 GPD/Site for the dump station

Recreational Campgrounds with 3-way hookups

60 GPD/Site

Construction Camps

50 GPD/Person

Day Camps (not including meals)

15 GPD/Person

Dining Facility

3 GPD/Person/meal

Residential Youth Recreation Camps

25 GPD/Person plus 3 GPD/Person/meal

CATERERS - Function Rooms

12 GPD/patron

CHURCHES:

Sanctuary Seating

3 GPD/Seat

Church Suppers

12 GPD/Seat

COUNTRY CLUBS - PRIVATE

Dining Room

10 GPD/Seat

Snack Bar

10 GPD/Seat

Locker & Showers

20 GPD/Locker

DAY CARE CENTERS

10 GPD/Person

DENTISTS

10 GPD/Chair plus 35 GPD/Staff Member

DOCTOR'S OFFICES

250 GPD/Doctor

DOG KENNELS

50 GPD/Kennel, with one dog per kennel

DWELLINGS:

Apartment - Studio or One-Bedroom

225 GPD

Apartment - 2 or More Bedrooms

150 GPD/Bedroom

Residence - Single-Family

300 GPD plus 150 GPD for each bedroom over 2

Residence - Duplex

300 GPD plus 150 GPD for each bedroom over 2 for each unit

Rooming House - With Meals

60 GPD/Person

Rooming House - Without Meals

40 GPD/Person

Senior Housing

See Senior Housing

FACTORIES (Exclusive of Industrial Waste):

Without Cafeteria or Showers

10 GPD/Person

With Cafeteria, No Showers

15 GPD/Person

With Cafeteria and Showers

20 GPD/Person

Warehouses

10 GPD/Person

FIRE STATIONS - Without full-time employees; without floor drains or food preparation

5 GPD/Person

FOOD SERVICE:

Cafeteria or table service, plus toilet and kitchen waste

40 GPD/Seat plus 20 GPD/Employee

Cafeteria or table service, paper service, plus toilet and kitchen waste

20 GPD/Seat plus 20 GPD/Employee

Ice cream dipper

100 GPD/dipper plus 20 GPD/Employee

Kitchen Waste only

3 GPD/Meal served plus 20 GPD/Employee

Bars and lounges

20 GPD/Seat plus 20 GPD/Employee

Function Rooms

12 GPD/Seat plus 20 GPD/Employee

GYMS

10 GPD/participant plus 3 GPD/Spectator seat

HAIRDRESSERS

150 GPD/Chair plus 20 GPD/Employee

HOSPITALS

200 GPD/Bed plus 20 GPD/Employee

HOTELS AND MOTELS

200 GPD/Room plus 10 GPD/Employee

INSTITUTIONS OTHER THAN HOSPITALS

See Residential Institutions

LAUNDROMATS, COIN-OPERATED

500 GPD/Machine

LOUNGES

See Food Service, Bars/Lounges

MANUFACTURED HOUSING PARKS

150 GPD/ Bedroom/Site with 300 GPD/Site minimum

MOTELS, see HOTELS

NURSING HOMES

125 GPD/Bed plus 20 GPD/Employee

OFFICE BUILDINGS:

Without Cafeteria

10 GPD/Employee

With Cafeteria

15GPD/ Employee

Unspecified Office Space

5 GPD/100 ft2

PICNIC PARKS

See Recreational Facilities

RECREATIONAL FACILITIES

Toilet Waste Only

5 GPD/person

With Showers and Toilets

10 GPD/person

RESIDENTIAL INSTITUTIONS OTHER THAN HOSPITALS AND NURSING HOMES

135 GPD/Bed plus 20 GPD/Employee

RESTAURANTS

See Food Service

SCHOOLS:

Boarding

100 GPD/resident student or employee

plus Day School loading for non-resident students and employees

Day, Without Gym, Cafeteria, or Showers

10 GPD/student or employee

Day, Without Gyms or Showers, with Cafeteria

15 GPD/student or employee

Day, With Gyms, Showers, and Cafeteria

25 GPD/student plus 15 GPD/employee

SENIOR HOUSING

125 GPD/2 Bedroom unit, maximum 2 person occupancy

SERVICE STATIONS

75 GPD/Island plus 10 GPD/Employee

SKATING RINKS

See Gyms

SKI AREAS

See Recreational Facilities

STORES:

Dry Goods

5 GPD/100 ft2 plus 10 GPD/employee

Supermarkets with Meat Dept. without Garbage Grinder

7.5 GPD/100 ft2

Supermarkets with Meat Dept. with Garbage Grinder

11 GPD/100 ft2

SWIMMING POOLS, Public

See Recreational Facilities

TENNIS COURTS

See Recreational Facilities

THEATERS

3 GPD/Auditorium Seat/Show

TOWN HALLS

5 GPD/Seat for total seating capacity

TOWN OFFICES

10 GPD/Office employee plus 5 GPD /Transient

TRAVEL TRAILER PARKS

See Camps

WAREHOUSES

See Factories

(f) For any combination of uses, such as a day camp that serves meals, a recreational facility that has a cafeteria, a ski area that has a day care, or a single-family residence that also has a studio or 1-bedroom apartment, the loading shall be the combined total of the loading for the separate uses.
(g) If a property contains more than one dwelling structure and multiple dwelling structures will be connected to a shared ISDS, the unit design flow for any structure that is a studio or one-bedroom dwelling unit shall be 225 GPD so long as the minimum design flow of the shared ISDS is 300 GPD or greater.
(h) For any structure where the use is not listed in Table 1008-1, the permitted designer shall submit documentation to support the estimated maximum daily flow.

N.H. Code Admin. R. Env-Wq 1008.03

(See Revision Note at chapter heading for Env-Wq 1000) #9086, eff 2-9-08; amd by #9904-A, eff 4-16-11

Amended by Volume XXXVI Number 41, Filed October 13, 2016, Proposed by #11184, Effective 10/1/2016, Expires 10/1/2026.
Amended by Volume XXXIX Number 06, Filed February 7, 2019, Proposed by #12716, Effective 1/24/2019, Expires 1/24/2029.