Section Env-Sw 310.02 - Standard Permit Application Fees for Facilities Without a Temporary Permit(a) The permit application fee (PAF) for a standard permit for a facility without a temporary permit shall be: (1) Zero if the facility is scheduled to close; or(2) The sum of the minimum base fee (MBF) as specified in (b) below plus the product of a capacity factor (CF) as specified in (c) below multiplied by a lifespan index (LI) as specified in (d) below, plus the cost of completing a background investigation (BI) pursuant to Env-Sw 316, plus the cost of public notice and hearing (PNH) pursuant to Env-Sw 304, as illustrated in the following equation: PAF = MBF + (CF)(LI) + BIF + PNH
(b) The MBF shall be the largest fee specified in Table 310-I which corresponds to any function encompassed at the facility: TABLE 310-I
MBF for Single Function Facilities
Facility Type | Minimum Base Fee (MBF) |
Landfill, lined | $15,000 |
Landfill, unlined | $ 5,000 |
Processing/Treatment Collection/Storage/Transfer | $ 2,000 $ 2,000 |
(c) The CF shall be determined from Table 310-II based on the design capacity of the facility in tons per day (TPD), as demonstrated in the application: TABLE 310-II
CF Based on Facility Capacity
Facility Capacity (TPD) | Capacity Factor |
601 or more | $20,000 |
301 to 600 | $10,000 |
121 to 300 | $5,000 |
31 to 120 | $2,000 |
30 or fewer | $1,000 |
(d) The LI shall be determined from Table 310-III based on the designed active life expectancy of the facility, as demonstrated in the permit application: Facility Life Expectancy | Lifespan Index |
more than 10 years | 1.0 |
more than 5, to 10 years | 0.8 |
more than 1, to 5 years | 0.4 |
1 year or less | 0.1 |