Current through Register No. 45, November 7, 2024
Section Env-Sw 2105.09 - Site Work Zones(a) To reduce the potential for asbestos fibers to be released to the environment by persons and equipment leaving a major or minor project site, site work zones shall be established and delineated to: (1) Separate clean operations from contaminated operations; and(2) Control the flow of personnel and equipment between such operations.(b) The site work zones required to comply with (a), above, shall be established and maintained in accordance with the provisions for site control provided in Chapter 9 of the Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities, NIOSH publication No. 85-115, available as noted in Appendix B.N.H. Admin. Code § Env-Sw 2105.09
#7647, eff 2-16-02 (See Revision Note at chapter heading for Env-Sw 2100) (formerly Env-Wm 3905.09); ss by #9645, eff 2-16-10
Amended by Volume XXXVIII Number 37, Filed September 13, 2018, Proposed by #12605, Effective 9/1/2018, Expires 9/1/2028.