Section Env-Sw 1104.08 - Interaction with Department During Construction(a) During construction, the permittee shall provide department personnel with access to the construction site for monitoring and inspection purposes, pursuant to Env-Sw 2000.(b) During construction, the permittee shall provide department personnel with access to a construction trailer work station, or other appropriate on-site work station, for use in reviewing plans, specifications and other construction-related records.(c) During construction, the permittee shall allow department personnel to attend scheduled pre-construction meetings and other construction-related meetings with the project engineer or the contractor, or both.(d) The permittee shall address all issues of concern that the department identifies in writing as a consequence of inspecting or monitoring facility construction activities.(e) If an issue of concern pursuant to (d) above involves a determination by the department that facility construction might not be proceeding in accordance with the approved design plans and specifications, the permittee shall either: (1) Voluntarily halt construction until the issue is resolved; or(2) Proceed with construction on the basis that the department shall only grant approval to operate the facility after the issue of concern is resolved or, if the issue of concern involves the construction of a facility closure system, on the basis that the department shall only release the permittee from financial assurance obligations after the issue of concern is resolved.(f) Revocation or suspension of the construction approval shall be subject to the provisions in Env-Sw 306.N.H. Admin. Code § Env-Sw 1104.08
#6619-B, eff 10-29-97; (See Revision Note at chapter heading for Env-Sw 1100) ss by #8459, eff 10-28-05 (formerly Env-Wm 2804.08 )
Amended byVolume XXXIV Number 24, Filed June 12, 2014, Proposed by #10598, Effective 7/1/2014, Expires7/1/2024.