Section Env-Sw 1104.02 - Notice of Intent to Construct(a) A notice of intent to construct shall include: (1) Facility identification;(2) A construction schedule that provides the following information: a.The intended starting date of construction; andb.The discrete construction activities to be performed, including: 1.The order in which they will be performed;2.The projected starting date for each; and3.The estimated length of time required to complete each activity; (3) The name, address and professional qualifications of the construction contractor(s);(4) For construction of a facility which is subject to Env-Sw 1104.06, the name(s), address(es), telephone number(s) and professional qualifications of the resident engineer and project engineer as required by Env-Sw 1104.06;(5) For construction of a facility which is not subject to Env-Sw 1104.06, the name(s), address(es) and telephone number(s) of the person(s) in responsible charge of construction activities;(6) Identification of the plans and specifications approved for construction, by attaching a copy of the approval or providing reference to the terms and conditions of the permit wherein the approval is granted; and(7) Affirmation that all other prerequisite approvals and actions, as specified in Env-Sw 1104.01(a), have been satisfied for the proposed construction activity.(b) The notice of intent to construct shall be signed by the permittee and property owner.(c) The notice of intent to construct shall be: (1) Filed with the department in duplicate; and(2) Copied to the host municipality and district.N.H. Admin. Code § Env-Sw 1104.02
#6619-B, eff 10-29-97; amd by #6894-B, eff 12-1-98; amd by #7225, eff 3-31-00; (See Revision Note at chapter heading for Env-Sw 1100) ss by #8459, eff 10-28-05 (formerly Env-Wm 2804.02 )
Amended byVolume XXXIV Number 24, Filed June 12, 2014, Proposed by #10598, Effective 7/1/2014, Expires7/1/2024.