"Approved design capacity" means the quantity of waste a facility is authorized to manage, expressed as follows:
N.H. Admin. Code § Env-Sw 102.09
(See Revision Note at chapter heading for Env-Sw 100) #8460-B, eff 10-28-05
"Approved design capacity" means the quantity of waste a facility is authorized to manage, expressed as follows:
N.H. Admin. Code § Env-Sw 102.09
(See Revision Note at chapter heading for Env-Sw 100) #8460-B, eff 10-28-05