Current through Register No. 45, November 7, 2024
Section Env-Or 606.10 - Remedial Action Plan(a) A responsible party required to conduct a site investigation under Env-Or 606.01 shall prepare a remedial action plan unless exempted under Env-Or 606.11.(b) The responsible party shall submit a report of the remedial action plan required in (a), above, to the department within 120 days following written notice from the department that a remedial action plan is required under (a), above.(c) The remedial action plan report shall be dated, signed, and sealed by the engineer of record.(d) The remedial action plan shall: (1) Provide for protection of human health and the environment;(2) Provide a detailed evaluation of remedial alternatives pursuant to Env-Or 606.12(c) with justification for the recommended alternative;(3) Recommend action to: a. Remove or treat the source of contamination;b. Contain the contamination source to limit the impact to groundwater, surface water, and soil to the extent feasible;c. Protect human health from exposure through the indoor air exposure pathway;d. Protect human health from exposure through the direct contact exposure pathway;e. Contain contaminated groundwater within the limits of a proposed groundwater management zone, delineated in accordance with Env-Or 607.05;f. Restore groundwater quality to the groundwater quality criteria specified in Env-Or 603.01; andg. Restore soil quality to the soil remediation criteria specified in Env-Or 606.19; and(4) Provide for financial assurance pursuant to Env-Or 606.20 and Env-Or 606.21, as applicable.N.H. Admin. Code § Env-Or 606.10
(See Revision Note at chapter heading for Env-Or 600) #8812, eff 2-1-07
Amended by Volume XXXV Number 23, Filed June 11, 2015 , Proposed by #10831, Effective 6/1/2015, Expires6/1/2025.