Section Env-Or 408.09 - Permanent Closure: Inspection Required(a) The owner shall not backfill the excavation zone or remove the UST from the site until the department has inspected:(1) The soil and groundwater in the vicinity of the UST and piping for evidence of contamination; and(2) The UST for evidence of corrosion and leakage.(b) If the department has been notified of the closure date and is unable to inspect the site within 7 department business days of that date, the department shall grant permission for a consultant or other person knowledgeable in site assessments for contamination to inspect the site.(c) If permission is granted pursuant to (b), above, the individual inspecting the site shall: (1) Conduct the inspection specified in (a)(1) and (2), above; and(2) Submit a report to the department within 30 days of such inspection.(d) The report required by (c), above, shall contain a detailed account of the inspection, specifically including whether any evidence of soil and groundwater contamination or corrosion and leakage was observed.N.H. Admin. Code § Env-Or 408.09
(See Revision Note at chapter heading for Env-Or 400) #10393, eff 9-1-13
Amended by Volume XXXVIII Number 45, Filed November 8, 2018, Proposed by #12643, Effective 10/10/2018, Expires 10/10/2028.