Current through Register No. 50, December 12, 2024
Section Env-Dw 305.18 - Completion of Approval Process Upon receipt of department approval of the preliminary report, the applicant shall:
(a) Perform the pumping test and water quality sampling program in accordance with Env-Dw 305.19 and any conditions specified in the approval;(b) Demonstrate that under existing land use and aquifer conditions, acceptable water quality can be delivered by the well provided that, for parameters which exceed primary or secondary maximum contaminant levels under Env-Dw 702 through 706, treatment or other management techniques may be used if approved by the department in accordance with Env-Dw 405;(c) Establish the permitted production volume in accordance with Env-Dw 305.20;(d) Refine the wellhead protection area delineation in accordance with Env-Dw 305.21;(e) Update and revise the contamination source inventory and the water use inventory in accordance with Env-Dw 305.22;(f) Establish a contamination source control program in accordance with Env-Dw 305.23 for any known sources of contamination identified in accordance with Env-Dw 305.22;(g) Establish a wellhead protection program in accordance with Env-Dw 305.24;(h) Document that the construction of the well is in compliance with applicable water well construction standards in accordance with Env-Dw 305.25;(i) Submit a final report to the department in accordance with Env-Dw 305.26;(j) Submit and obtain approval for a water conservation plan prepared in accordance with Env-Wq 2101; and(k) Obtain approval of the new small production well in accordance with Env-Dw 305.29.N.H. Admin. Code § Env-Dw 305.18
Adopted by, Volume XXXVI Number 14, Filed April 7, 2016, Proposed by #11062, Effective 4/1/2016, Expires 4/1/2026.