N.H. Code Admin. R. Env-Dw 303.17

Current through Register No. 25, June 20, 2024
Section Env-Dw 303.17 - Permitted Production Volume
(a) The applicant shall propose a permitted production volume based on an analysis of the data derived from the source evaluation required by Env-Dw 303.07(g) and completed as specified in Env-Dw 303.14.
(b) The applicant shall calculate the proposed permitted production volume by applying the natural flow rate or pumping test production rate over 24 continuous hours of operation.
(c) The applicant shall use the proposed permitted production volume to determine the protected area and, if necessary, to develop a potential contamination source control program.
(d) The department shall accept the proposed permitted production volume if it determines, based on the data and documentation submitted by the applicant in support of the proposed permitted production volume, that the data is valid, the calculation was performed correctly, and other applicable requirements are met.
(e) Although the actual rate at which water is withdrawn from an approved source may vary, the permitted production volume shall not be exceeded.

N.H. Code Admin. R. Env-Dw 303.17

(See Revision Note at part heading for Env-Dw 303) #8998, eff 9-29-07

Amended by, Volume XXXVI Number 14, Filed April 7, 2016, Proposed by #11059, Effective 4/1/2016, Expires 4/1/2026.