N.H. Code Admin. R. Env-Dw 1206.08

Current through Register No. 25, June 20, 2024
Section Env-Dw 1206.08 - Operation of Gate Valves

The PORS O/O shall cause all gate valves in the PORS to be fully turned at least once every 12 months, timed to coincide with periods of minimum consumer usage.

N.H. Code Admin. R. Env-Dw 1206.08

#9572, INTERIM, eff 10-21-09, EXPIRES: 4-19-10; ss by #9660, eff 2-24-10

Amended by Volume XXXVIII Number 32, Filed August 9, 2018, Proposed by #12582, Effective 7/24/2018, Expires 7/24/2028.