N.H. Code Admin. R. Env-Dw 1203.03

Current through Register No. 25, June 20, 2024
Section Env-Dw 1203.03 - Application for Approval of New or Expanded PORS
(a) The person proposing to construct a new PORS or to expand or modify an existing PORS shall provide to the department:
(1) One copy of plans and specifications as specified in Env-Dw 1203.04 and Env-Dw 1203.05, respectively, for the PORS, including each pump, pump house, storage tank, and other appurtenance, as applicable, and all wiring, control devices, and piping;
(2) The identifying, quantifying, and contact information specified in Env-Dw 405.06(b)(1)-(5), (8), and (9); and
(3) A letter from the O/O of the supplying water system confirming that adequate quantities of water are available to serve the proposed new or expanded PORS and adequate system pressures will be maintained with the proposed new or expanded PORS on-line.
(b) If a portion of the PORS is to be constructed at a later date, or phased with the actual growth of the development, the applicant shall so state at the time of the original submittal.
(c) The PORS O/O shall sign and date the submittal required by (a), above, to certify that the information provided is accurate.
(d) If the new or expanded PORS will have a design flow greater than 20,000 gallons per day (gpd) or 50 or more service connections, the plans and specifications shall be stamped by a professional civil or sanitary engineer licensed in the State of New Hampshire.

N.H. Code Admin. R. Env-Dw 1203.03

#9572, INTERIM, eff 10-21-09, EXPIRES: 4-19-10; ss by #9660, eff 2-24-10

Amended by Volume XXXVIII Number 32, Filed August 9, 2018, Proposed by #12582, Effective 7/24/2018, Expires 7/24/2028.