N.H. Code Admin. R. Env-A 4609.02

Current through Register No. 25, June 20, 2024
Section Env-A 4609.02 - Requirements for Installation, Certification, and Data Accounting

The owner or operator of each CO22 budget unit shall:

(a) Install all monitoring systems required under this part for monitoring CO2 mass emissions in accordance with 40 CFR Part 75, including all systems required to monitor CO2 concentration, stack gas flow rate, O concentration, heat input, and fuel flow rate, as applicable, in accordance with 40 CFR 75.13, 75.71 and 75.72 and all portions of appendix G of 40 CFR part 75, as applicable, except that equation G-1 in 40 CFR Part 75 shall not be used to determine CO2 emissions under Env-A 4609;
(b) Successfully complete all certification tests required under Env-A 4609.06 and meet all other requirements of Env-A 4609 and 40 CFR part 75 applicable to the monitoring systems under (a), above; and
(c) Record, quality-assure, and report the data from the monitoring systems identified in (a), above, by the dates specified in Env-A 4609.03.

N.H. Code Admin. R. Env-A 4609.02

#9283, INTERIM, eff 10-1-08, EXPIRED: 3-30-09

New. #9444, eff 4-3-09; ss by #10468, eff 1-1-14

Amended by Volume XL Number 2, Filed January 9, 2020, Proposed by #12967, Effective 1/1/2020, Expires 1/1/2030.