N.H. Code Admin. R. Env-A 3308.04

Current through Register No. 25, June 20, 2024
Section Env-A 3308.04 - Fuel Supplier Requirements

A large MWC facility combusting PWR shall obtain PWR only from suppliers that:

(a) Produce PWR in compliance with all requirements of 40 CFR 241.4(a)(5) and this part;
(b) Collect 3 random representative grab samples for each 250 tons of PWR produced, which shall be composited into a single well mixed sample for each 1000 tons of PWR produced;
(c) Have the composite sample analyzed as specified in Env-A 3308.06; and
(d) Pass an independent third-party inspection in accordance with Env-A 3308.05 prior to November 15th of each year in which PWR will be offered to a large MWC facility for combustion.

N.H. Code Admin. R. Env-A 3308.04

Derived From Volume XXXVIII Number 41, Filed October 11, 2018, Proposed by #12628, Effective 9/27/2018, Expires 9/27/2028.