N.H. Code Admin. R. Env-A 2806.03

Current through Register No. 25, June 20, 2024
Section Env-A 2806.03 - Notification of Changes Required
(a) Within 10 days after a permit-by-notification facility has commenced operation in a location other than that identified in the information submitted pursuant to Env-A 2806.02, the owner or operator shall submit in writing to the department a location change notice that contains the information listed in (c), below.
(b) At the same time the information is submitted to the department, the owner or operator shall send a copy of the written information to the town where the facility was previously located and to the town in which the facility is now located, if different.
(c) The information required by (a), above, shall be as follows:
(1) The unique facility identification assigned by the department in the initial permit-by-notification;
(2) The physical location from which the facility was moved; and
(3) The physical location to which the facility was moved.
(d) Within 10 days after the replacement of any affected equipment, the owner or operator shall submit in writing to the department a notification that contains:
(1) The information specified in 40 CFR 60.676(a)(1), (2), (3), and (4), as applicable; and
(2) The date on which testing of the new equipment will be conducted.
(e) Any notice filed pursuant to (a) or (d), above, shall be signed as specified in Env-A 2806.05.

N.H. Code Admin. R. Env-A 2806.03

#9793, eff 10-1-10

Amended by Volume XXXIX Number 02, Filed January 10, 2019, Proposed by #12693, Effective 12/22/2018, Expires 12/22/2028.